Amazon cover image
Image from Amazon.com
Image from Google Jackets

Computer intergrated construction project scheduling / John Buttelwerth.

By: Material type: TextTextPublication details: [year of publication not identified]Description: xiv, 482p. ill. 28cmISBN:
  • 0131114654
Subject(s): DDC classification:
  • 690.0685 BUT 2005
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode
Book-GN Book-GN PERPUSTAKAAN POLITEKNIK SULTAN SALAHUDDIN ABDUL AZIZ SHAH 690.0685 BUT 2005 (Browse shelf(Opens below)) Available 0000031600

Includes index p.478 - 482

There are no comments on this title.

to post a comment.